Tower Engineering Home Site Map Tower Engineering

Hospital - Maricopa

Project: Hospital - Arizona Fill Material: High Performance Ceramic (HPC)
Location: Phoenix, Arizona Design Conditions:95°F(HWT) - 85°F(CWT) - 78°F(WBT)
Type: Fiberglass Cooling Capacity: 2,000 tons
No. Cells: 2 cells Project Completion: 2006

Click on the image below to view enlarged version:

Hopsital - Maricopa - Installation Hopsital - Maricopa - Gear Hopsital - Mricopa - Drift Eliminator
Installation Gear Drift Eliminator
Hopsital - Maricopa - Fan Stack Hopsital - Maricopa - Stairs Hopsital - Maricopa - Tower
Fan Stack Stairs Tower

Hospital-California
 
Hospital-Arizona/Banner Baywood



 

 

Copyright © 2009 Tower Engineering, Inc.
2821 Lackland Road Suite 340
Fort Worth, Texas 76116 U.S.A.