Location: Las Vegas, Nevada
Type: New Tower (Concrete Structure)
No. Cells: 1
Fill Material: Ceramic Block Tile (CBT)
Design Conditions: 95°F(HWT) – 85°F(CWT) – 77.6°F(WBT)
Cooling Capacity: 2,000 tons (6,000 GPM)
Project Completion: 2004
![](http://www.tei-usa.com/wp-content/uploads/2015/06/project_item_largeimge_mainimg.jpg)
Location: Las Vegas, Nevada
Type: New Tower (Concrete Structure)
No. Cells: 1
Fill Material: Ceramic Block Tile (CBT)
Design Conditions: 95°F(HWT) – 85°F(CWT) – 77.6°F(WBT)
Cooling Capacity: 2,000 tons (6,000 GPM)
Project Completion: 2004