Airport – Washington D.C.

Location: Washington D.C.
Type: New Tower (Concrete Structure)
No. Cells: 5

Fill Material: Ceramic Block Tile (CBT)
Design Conditions: 95°F(HWT) – 85°F(CWT) – 79°F(WBT)
Cooling Capacity: 5,750 tons (17,250 GPM)
Project Completion: 1995